ProductsIntelligenceLicensingAnalyst AccessPricingMethodologyContact
ENERGY, POWER & COMMODITIES

Form ADV disclosures

Form ADV disclosure requirements are a live compliance pressure point for investment advisers operating in the Energy, Power & Commodities sector, where the U.S. Securities and Exchange Commission has sharpened its scrutiny of conflicts of interest, fee structures, and environmental risk disclosures tied to commodity-linked strategies. The SEC's 2023 Marketing Rule amendments and ongoing examination priorities from the Division of Examinations have pushed commodity-focused advisers to revisit Part 2A brochure language, particularly around how trading in physical commodities, derivatives, and energy transition assets is characterized. Cresthaven monitors filings, staff guidance, and examination findings across the SEC and the U.S. Commodity Futures Trading Commission so compliance teams catch material disclosure gaps before an exam does.

Watch

  • SEC Division of Examinations: Form ADV Part 2A accuracy flagged in recent RIA exam sweeps
  • CFTC dual-registrant obligations creating disclosure misalignment between Form ADV and Form CTA
  • Climate-related conflict disclosures under informal SEC staff pressure, no final rule yet
  • Marketing Rule compliance: performance advertising tied to commodity indices under active review

Recent material activity in Energy, Power & Commodities

A selection of recent published briefs; this is not a complete archive.

  • Nov 27, 2026MATERIAL

    New Zealand Electricity Authority opens four Code investigations into medically dependent consumer disconnections and generation faults

    The Electricity Authority Te Mana Hiko has opened four investigations into alleged breaches of the Electricity Industry Participation Code. Three concern Consumer Care Obligations for medically dependent consumer disconn…

    Read a full sample brief →
  • Nov 27, 2026MATERIAL

    AER releases draft access arrangement decision for Roma to Brisbane Pipeline covering the 2027 to 2032 period

    The Australian Energy Regulator (AER) released a draft access arrangement decision on November 26, 2026 for the Roma to Brisbane Pipeline (RBP), covering the 2027 to 2032 period. The draft proposes $371.3 million (nomina…

    Read a full sample brief →
  • Nov 26, 2026MATERIAL

    NRC opens scoping process for environmental impact statement on proposed General Matter uranium enrichment facility in Kentucky

    The NRC has published a notice of intent to conduct a scoping process and prepare an environmental impact statement (EIS) for a proposed uranium enrichment facility in McCracken County, Kentucky. The notice opens a publi…

    Read a full sample brief →
  • Nov 26, 2026MATERIAL

    EPA proposes to approve Texas SO2 attainment plan for Navarro County nonattainment area

    The EPA published a proposed approval on November 27, 2026 of Texas's State Implementation Plan revision for the 2010 1-hour sulfur dioxide primary National Ambient Air Quality Standard in the Navarro County nonattainmen…

    Read a full sample brief →
  • Nov 26, 2026MATERIAL

    EPA proposes technical updates to RCRA hazardous waste TSDF permitting regulations unchanged for over three decades

    EPA published a proposed rule on November 27, 2026, to update permitting regulations for hazardous waste treatment, storage, and disposal facilities under the federal solid and hazardous waste statute. The proposal corre…

    Read a full sample brief →
  • Nov 26, 2026MATERIAL

    FERC publishes environmental assessment for Starks Hydroelectric Project surrender and dam removal in Maine

    FERC staff released an Environmental Assessment on November 23, 2026 for R.J. Fortier Hydropower, Inc.'s proposed surrender of the Starks Hydroelectric Project exemption and removal of the dam, powerhouse, and appurtenan…

    Read a full sample brief →
  • Nov 26, 2026MATERIAL

    FERC staff releases environmental assessment for WBI Energy's 17.2-mile North Dakota gas pipeline expansion

    FERC staff published an environmental assessment on November 27, 2026 for WBI Energy Transmission's proposed Line Section 32 Expansion Project in Williams and McKenzie Counties, North Dakota. The EA concludes the project…

    Read a full sample brief →
  • Nov 26, 2026MATERIAL

    New Zealand Electricity Authority approves five amendments to Transmission Pricing Methodology effective April 2027

    The Electricity Authority Te Mana Hiko approved five amendments to the Transmission Pricing Methodology on November 23, 2026, following a July 2026 consultation on six proposed changes. Five of the six proposals were acc…

    Read a full sample brief →
  • Nov 25, 2026MATERIAL

    NRC issues draft Environmental Impact Statement for Orano uranium enrichment facility in Tennessee

    The NRC published a draft Environmental Impact Statement on November 25, 2026, covering Orano Enrichment USA's application to construct and operate a gaseous centrifuge uranium enrichment facility in Roane County, Tennes…

    Read a full sample brief →
  • Nov 25, 2026MATERIAL

    DOE announces intent to issue Amendment 000010 to grid resilience formula grant program for states and tribes

    The U.S. Department of Energy and National Energy Technology Laboratory issued a Notice of Intent on November 25, 2026, announcing plans to release Amendment 000010 to the grid resilience formula grant program in Q1 FY 2…

    Read a full sample brief →