Software Bill of Materials requirements
Software Bill of Materials requirements are arriving in the energy sector through overlapping federal mandates, with the U.S. Department of Energy and the U.S. Cybersecurity and Infrastructure Security Agency driving disclosure obligations that now reach operational technology vendors supplying grid and pipeline operators. The White House Executive Order 14028 on Improving the Nation's Cybersecurity established SBOM as a baseline expectation for software used in critical infrastructure, and energy firms are now working backward through vendor contracts to confirm which suppliers can actually produce machine-readable SBOMs to spec. The Federal Energy Regulatory Commission has not yet issued a standalone SBOM rule, but its ongoing critical infrastructure protection proceedings are the near-term vehicle to watch.
Watch
- CISA's minimum SBOM data field requirements and whether OT vendors comply
- FERC CIP standards revision docket for any SBOM incorporation language
- DOE's updated Cyber-Informed Engineering guidance referencing SBOM for grid software
- Vendor contract audit clauses: do they obligate SBOM delivery on new software releases?
- EU Cyber Resilience Act SBOM provisions applying to energy software sold into European markets
Recent material activity in Energy, Power & Commodities
A selection of recent published briefs; this is not a complete archive.
New Zealand Electricity Authority opens four Code investigations into medically dependent consumer disconnections and generation faults
The Electricity Authority Te Mana Hiko has opened four investigations into alleged breaches of the Electricity Industry Participation Code. Three concern Consumer Care Obligations for medically dependent consumer disconn…
Read a full sample brief →AER releases draft access arrangement decision for Roma to Brisbane Pipeline covering the 2027 to 2032 period
The Australian Energy Regulator (AER) released a draft access arrangement decision on November 26, 2026 for the Roma to Brisbane Pipeline (RBP), covering the 2027 to 2032 period. The draft proposes $371.3 million (nomina…
Read a full sample brief →NRC opens scoping process for environmental impact statement on proposed General Matter uranium enrichment facility in Kentucky
The NRC has published a notice of intent to conduct a scoping process and prepare an environmental impact statement (EIS) for a proposed uranium enrichment facility in McCracken County, Kentucky. The notice opens a publi…
Read a full sample brief →EPA proposes to approve Texas SO2 attainment plan for Navarro County nonattainment area
The EPA published a proposed approval on November 27, 2026 of Texas's State Implementation Plan revision for the 2010 1-hour sulfur dioxide primary National Ambient Air Quality Standard in the Navarro County nonattainmen…
Read a full sample brief →EPA proposes technical updates to RCRA hazardous waste TSDF permitting regulations unchanged for over three decades
EPA published a proposed rule on November 27, 2026, to update permitting regulations for hazardous waste treatment, storage, and disposal facilities under the federal solid and hazardous waste statute. The proposal corre…
Read a full sample brief →FERC publishes environmental assessment for Starks Hydroelectric Project surrender and dam removal in Maine
FERC staff released an Environmental Assessment on November 23, 2026 for R.J. Fortier Hydropower, Inc.'s proposed surrender of the Starks Hydroelectric Project exemption and removal of the dam, powerhouse, and appurtenan…
Read a full sample brief →FERC staff releases environmental assessment for WBI Energy's 17.2-mile North Dakota gas pipeline expansion
FERC staff published an environmental assessment on November 27, 2026 for WBI Energy Transmission's proposed Line Section 32 Expansion Project in Williams and McKenzie Counties, North Dakota. The EA concludes the project…
Read a full sample brief →New Zealand Electricity Authority approves five amendments to Transmission Pricing Methodology effective April 2027
The Electricity Authority Te Mana Hiko approved five amendments to the Transmission Pricing Methodology on November 23, 2026, following a July 2026 consultation on six proposed changes. Five of the six proposals were acc…
Read a full sample brief →NRC issues draft Environmental Impact Statement for Orano uranium enrichment facility in Tennessee
The NRC published a draft Environmental Impact Statement on November 25, 2026, covering Orano Enrichment USA's application to construct and operate a gaseous centrifuge uranium enrichment facility in Roane County, Tennes…
Read a full sample brief →DOE announces intent to issue Amendment 000010 to grid resilience formula grant program for states and tribes
The U.S. Department of Energy and National Energy Technology Laboratory issued a Notice of Intent on November 25, 2026, announcing plans to release Amendment 000010 to the grid resilience formula grant program in Q1 FY 2…
Read a full sample brief →